MASTER FEE SCHEDULE

FISCAL YEAR 2023


             


AIRPORT HANGAR MONTHLY LEASE RATES


Units 2, 3, 4, 5, 6, 7, 8 and 9
$126.00
Unit 13
$132.00
Units 1, 15, 16, 17, 18, 19, 20, 21 and 22
$204.00
Units 14 and 23 (single occupancy)
$270.00
Units 14 and 23 (double occupancy)
$372.00
42 x 34 Box Hangar (+$100 for additional plane storage)
$312.00
50 x 34 Box Hangar (+$100 for additional plane storage)
$368.00
75 x 75 Hangar (+$100 for each additional plane storage)
$1,200.00
60 x 60 Maintenance Hangar
$660.00
Nightly Tie Down Fee
$6.00
Covered Parking - Vehicle
$36.00
After Hours Call Out Fee for Non-emergency Services & Non-military
$90.00
   


ADMINISTRATIVE FEES

 
Returned Check Fee
$35.00
Credit/Debit Card Payment Fee (by phone or in person, including utility payments)
2% of transaction
*Paper Copy - Standard Size 8 1/2 x 11 (per page)
$0.10
*Paper Copy - Oversized 11 x 17 (per page)
$0.50
*Posting/Shipping Charges
Actual Cost
*Hard Copy Map Fee - 8 1/2 x 11 (per page)
$2.00
*Hard Copy Map Fee - 11 x 17 (per page)
$5.00
*Hard Copy Map Fee - Full Plan Size up to 32 x 42 (per page)
$40.00
Other Media
 
   *DVD/RW (each)
$2.00
   *Flash Drive (each)
$5.00
Other Non-listed Charges
Actual Cost
Fax Charges
 
   Local (per page)
$0.10
   Long Distance - Same Area Code (per page)
$0.50
   Long Distance - Other Area Code (per page)
$1.00
Personnel (per hour)
$35.00
*As allowed for public information requests
 
   


BUILDING & DEVELOPMENT

 
Building Permit Fees
 
   Single Family
Actual cost of 3rd party review plus inspection fees plus 20%
   Commercial/Multi-Family
Actual cost of 3rd party review plus inspection fees plus 20%
   Alterations, Renovations, Demolitions and Adds
Actual cost of 3rd party review plus inspection fees plus 20%
   House Moving
$100.00
   Storage Sheds in Excess of 120 sq ft
$25.00
   Fire Alarm
Actual cost of 3rd party review plus inspection fees plus 20%
   Clearing
$40.00
   Carport, Accessory Building, Detached Garage
$0.08 / sq ft / min $25.00 plus actual cost of 3rd party inspection fee
   Demolition
$50.00
   Re-inspection
Actual cost of 3rd party inspection fees
Electrical Permit Fees
 
   Single Family
$0.04 / sq ft / min $25.00 plus actual cost of 3rd party inspection fee
   Commercial/Multi-Family
$0.04 / sq ft / min $25.00 plus actual cost of 3rd party inspection fee
   Construction Meter Loop
$25.00 plus actual cost of 3rd party inspection fee
Event Street Closure Permit
$100.00
Mechanical Permit Fees
 
   Single Family
$0.04 / sq ft / min $25.00 plus actual cost of 3rd party inspection fee
   Commercial / Multi-Family
$0.04 / sq ft / min $25.00 plus actual cost of 3rd party inspection fee
Plumbing Permit Fees - Licensed Plumber Required for Inspections
 
   Single Family
$0.10 / sq ft / min $25.00 plus actual cost of 3rd party inspection fee
   Commercial/Multi-Family
$0.10 / sq ft / min $25.00 plus actual cost of 3rd party inspection fee
   Customer Shut-off Valve
$25.00 plus actual cost of 3rd party inspection fee
   Gas Piping System
$40.00 plus actual cost of 3rd party inspection fee
   Lawn Sprinkler System
$50.00 plus actual cost of 3rd party inspection fee
   Swimming Pool
Actual cost of 3rd party review plus inspection fees plus 20%
   Hot Water Heater Installation
$50.00 plus actual cost of 3rd party inspection fee
Plan Review
 
   Preliminary Plat
$375.00 + $10.00 / lot + USPS cost + engineer review cost
   Final Plat
$375.00 + $10.00 / lot + USPS cost + engineer review cost
   Re-plat/Amended Plat
$250.00 + $10.00 / lot + USPS cost + $75.00 GIS + engineer review cost
   Preliminary Plan Review 
Actual cost of 3rd party review plus 20%
   Commercial Plan Review
Actual cost of 3rd party review plus 20%
Miscellaneous  
   Contractor Registration Fee
$50.00
   Signs
$25.00 + $0.25 / sq ft
   Fence
$25.00
   Burn
$5.00 + prior written permission from City
   Floodplain
Actual cost of 3rd party fees plus 20%
   Re-roof $40.00 plus actual cost of 3rd party inspection fee
   Starting a Project Without a Permit
$100.00 + triple fee
   Street/Alley Closure Request
$500.00 + actual cost (publication & notification)
   Specific Use Permit
$250.00 + actual cost (publication & notification)
   Variance Request
$250.00 + actual cost (publication & notification)
   Rezoning of Property
$250.00 + actual cost (publication & notification)
   


CEMETERY

 
   Lots - The new section opened in 2019.  No single lots
   will be sold in this section until all single lot inventory
   in the established section is sold.
$600.00 / lot
   Lots - Established Section
$500.00 / lot
   Required Lot Purchase Fees / Lot ($30 recording fee + $20 
   administrative fee)
$50.00
   Affidavit of Heir(s) - Preparation Only
$75.00
   Deed Transfer - Preparation Only
$30.00
   Other Recording Fees Collected ($16 first page and
   $4 each additional page)
Actual Cost
Cremains Opening & Closing
 
   Monday - Friday
$250.00
   Weekends and Holidays (any portion thereof)
$350.00
   


CITIZEN COLLECTION STATION

 
City Resident Disposal Fees
                  
   Construction Material (excluding shingles)
$30.00 / cubic yd
   Shingles
$38.50 / cubic yd
   Antifreeze
$1.50 / gallon
   Oil Filters
$1.50 each 
   Oil
$2.00 / gallon
   Limbs & Brush (Green)
$2.50 / cubic yd
   Appliances
No Charge
   Batteries
No Charge
   Scrap Metal
No Charge
   Passenger and Light Truck Tires
$5.00 each
   Heavy Truck Tires
$16.00 each
   Agricultural Tires
$2.00 / Rim Inch
Non-City Resident Disposal Fees  
   Construction Material (excluding shingles) $39.00 / cubic yd
   Shingles
$50.00 / cubic yd
   Antifreeze
$2.00 / gallon
   Oil Filters
$2.00 each
   Oil
$3.00 / gallon
   Limbs & Brush (Green)
$3.25 / cubic yd
   Appliances
No Charge
   Batteries
No Charge
   Scrap Metal
No Charge
   Passenger and Light Truck Tires
$6.50 each
   Heavy Truck Tires
$21.00 each
   Agricultural Tires
$2.50 / Rim Inch
   


HOTEL OCCUPANCY TAX (HOT)

 
Owners or managers of record will be invoiced quarterly.  Section 94-171, Code of Ordinances
7% of room charge
   


LANTEX THEATER

 
Basic Rental (up to 3 hours)
$75.00
   Each Hour or Portion of an Hour Over 3 Hours (up to
   3 additional hours)
$25.00 / hour
        Examples of usage: film society, church functions, award
        ceremony, etc.
 
   Cleaning Fee or Cleaning Deposit
Up to $150.00
All Day Rental (up to 8 hours)
$150.00
   Each Hour or Portion of an Hour Over 8 Hours (up to
   2 additional hours, anything more to be billed at $250.00)
$25.00 / hour
        Examples of usage:  conferences, club meetings, etc.
 
   Cleaning Fee or Cleaning Deposit
Up to $150.00
Main Event Rental
$250.00
        Examples of usage:  concerts, shows, etc. that are taking a gate
        and/or generating revenue and/or may likely need the facility from
        morning through late evening

   Cleaning Fee or Cleaning Deposit
Up to $150.00
Additional Charges
 
   Security Deposit
$500.00
   On Site Manager - Required for any rental
$25.00 / hour
   Use of Projector - 4 Hours or Less
$50.00
   Use of Projector - 4 Hours or More
$100.00
   Projectionist
$25.00 / hour
   Sound Technician/Outside Contract - Per Event
$150.00
   Use of Table(s)
$10.00 each
   Use of Chair(s)
$2.00 each
 Concessions  
   Tenant/Main Street for Events
25% / 75%
   Sponsor/Main Street for Movies
50% / 50%

 


LLANO POLICE DEPARTMENT

 
Accident Reports
As Allowed by State Law
Peddler Permits - 1 Day / 1 Week / 90 Days / 1 Year
$20.00 / $40.00 / $60.00 / $220.00
Special Events Security Fee
$35.00 / hour
Permit Fee for Soliciting in the Right of Way
$50.00

ANIMAL CONTROL

 
Standard Licensing Fees
 
   Annual License Fee
$10.00
   Surrender Fee
$50.00
   Impound Fee
$15.00 + $8.00 / day held
   Quarantine at City-owned Facilities
$15.00 / day held
Adoption Fees + Required Signed Contract to Spay/Neuter, Rabies Vaccination and Pet License Fee
 
   Dog
$35.00
   Puppy
$50.00
   Cat
$25.00
   Kitten
$40.00
Dead Animal Disposal
$10.00
Trap - Lease Fee
$15.00 / week or $5.00 / day
   


OCCUPANCY TAX

 
Fee for a permit to sell alcoholic beverages shall be one-half of the fee charged by the Texas Alcoholic Beverage Commission for each license required for the permit applicant.
Collected Annually and
Fee Based on Permit Type
   


PARKS AND RECREATION

 

LLANO PARK FACILITIES AVAILABLE FOR RENTAL

 
BADU PARK - PAVILIONS
 
   Deposit (Refundable)
$50.00
   East Pavilion Fee
$40.00
   West Pavilion Fee, April 1 - October 31 (Splash Pad Open)
$100.00 / 3 hours
   West Pavilion Fee, November 1 - March 31 (Splash Pad Closed)
$40.00 / day
BADU PARK - RV RENTAL SPOTS (First Come, First Served) $35.00 / night
RAY HOUSE
Contact 325.247.7905
   Deposit
$100.00
   Fee
$100.00
ROBINSON PARK - EAST END OR WEST END
 
   Deposit - Refundable
$100.00
   Rental Fee
$100.00 / day
   Table Rentals (includes chairs)
$100.00 / day
   Table & Chair Deposit - Refundable
$5.00 each
ROBINSON PARK - PAVILION  
   Deposit - Refundable $100.00
   Rental Fee $100.00 / day
ROBINSON PARK - TENT CAMPING
$10.00 / night
ROBINSON RV PARK
Contact 325.247.7905
   Nightly
$30.00
   Weekly
$180.00
   Monthly
$430.00
   Seasonal - 4 Months
$1,300.00
   Seasonal - 5 Months
$1,625.00

JLK CENTER

 
Arena  
   1-Day Rental (Monday through Thursday)
$450.00 / day
   2-Day Weekend Rental (Friday & Saturday OR Saturday & Sunday)
$1,700.00
   3-Day Weekend Rental (Friday, Saturday & Sunday)
$2,250.00
   Required Deposit - 25% of Event Total
25%
Event Room
 
   Full Day
$1,000.00
   Half Day
$600.00
   Required Deposit - 50% of Event Total
50%
Entire JLK Facility - 3 Day Weekend
$3,050.00
   Required Deposit - 50% of Event Total
50%
Yard or Concession Area
$150.00 / day
   Required 50% of Event Total
50%
Other JLK Center Fees
 
Trailer Parking - 30 AMP
$25.00 / night
Trailer Parking - 50 AMP
$35.00 / night
Stalls $25.00 / day or night
Vendor Concession
$500.00 Move-out Fee,
Plus 10% of Revenue
Standard Sponsor - Banner Only
$1,000.00 / year
Gold Sponsor - Banner & Website Link
$1,500.00 / year

LLANO RIVER GOLF COURSE

 
Green Fees - Weekday
 
   18 Hole
$18.00
   Twilight
$12.00
   Senior
$12.00
   Military
$14.00
   Junior
$10.00
   9 Hole
$12.00
Cart Fees - Weekday
 
   Cart
$15.00
   Senior Cart
$13.00
   9 Hole Cart
$10.00
Green Fees - Weekend
 
   18 Hole
$23.00
   Twilight
$16.00
   Senior
$16.00
   Military
$18.00
   Junior
$13.00
   9 Hole
$14.00
Cart Fees - Weekend
 
   Cart
$15.00
   Senior Cart
$13.00
   9 Hole Cart
$10.00

SWIMMING POOL

 
   Admission
$4.00
   Seasonal Pass
$70.00
   Seasonal Pass - Family of 4
$180.00 + $15.00 each additional
family member
   Parties
$75.00 / hour
   


UTILITIES - Deposits & Fees, Electricity, Sanitation, Water, Wastewater

 

DEPOSITS & FEES

 
Deposits - Residential Customers With a Letter of Credit Showing 12 Month History of Timely Payments Within the Last 18 Months With a Prior Utility Company  
   Water Deposit
$25.00
   Wastewater Deposit
$25.00
   Electricity Deposit
$75.00
   Non-refundable Connect Fee
$50.00
      Total Due for Residential Customers With All 3 Services
$175.00
Deposits - Residential Customers Without a Letter of Credit
 
   Water Deposit
$25.00
   Wastewater Deposit
$25.00
   Electricity Deposit
$75.00
   Additional Deposit for No Letter of Credit
$100.00
   Non-refundable Connect Fee
$50.00
      Total Due for Residential Customers With All 3 Services
$275.00
Deposits - Commercial Customers
 
   Payment equal to one (1) times the average monthly billing
   calculated over the most recent 12 months billed
Determined at time of application
   If facility is new or has no utility history for intended use, the deposit
   will be at the City Manager's discretion based on expected bill amount
 

OTHER FEES

 
Late Payment Penalty - a 10% penalty is charged for any balances paid after the due date.
Payments may be made in the Utility Office, in the Utility Drop Box or online.
Payments for due dates that fall on weekends or holidays are still due on the payment date.
There is no grace period after the due date.




10%
Penalty waivers are available for customers age 60 and up in accordance with Texas Utilities Code Chapter 182.002-182.004 with a request form and ID. 
 
   Returned Check Fee
$35.00
   Service Charge
$50.00
   Service Charge - After Hours or Same Day
$150.00
   Utility Trip Charge
$50.00
   Temporary Two (2) Week Connection Charge
$50.00
   Meter Accuracy Check (Re-read)
$50.00
   Re-connection Fee
$50.00
   Re-connection Fee - After Hours (After 3 PM, Before 8 AM Mon. - Thurs.,  Fri. or Weekends & Holidays)
$150.00
   Deferment Plan Fee
$0.00
   Fire Hydrant Meter Deposit
$1,500.00
   Fire Hydrant Meter Charge
$320.00 / month base fee
   Fire Hydrant Volume Rate
$.02 / gallon
   Theft of Service - Responsibility of Account Holder - Class "C" Misdemeanor
$500.00
   Meter Replacement (Due to Tampering)
1/2 of the tap fee
   Customer Service Inspection - Required for new service or if existing
   service has been discontinued for 30 days or more
$75.00
   Utilities Evaluation Fee - Water & Wastewater
      Engineering evaluation required for non-standard tap requests (when 6" water or
      wastewater line does not run parallel to the property).
$1,000.00 / tap
BULK NON-POTABLE WATER SALES
 
   Service Fee Per Load
$50.00
   Non-potable Bulk Water (1,000 gallon minimum) $20.00 / 1,000 gallons
   Bulk Reclaimed Water $20.00 / 1,000 gallons

ELECTRICITY

 
Residential Rate
 
   Customer Service Charge
$6.00
   City Distribution Charge < 1,000kWh
$0.0300 / kWh
   City Distribution Charge > 1,000 kWh
$0.0450 / kWh
   Power Cost Adjustment*
Variable / kWh
Small Commercial Rate
 
   Customer Service Charge
$16.00
   City Distribution Charge
$0.0385 / kWh
   Power Cost Adjustment*
Variable / kWh
Large Commercial Rate
 
   Customer Service Charge
$51.00
   City Distribution Charge
$0.0285 / kWh
   Demand Charge
$2.00 / kWh
   Power Cost Adjustment*
Variable / kWh
*The variable Power Cost Adjustment is the LCRA wholesale power bill to the City of Llano for wholesale power costs and services divided by the month's actual retail kilowatt hours to be billed
and shall be
adjusted up or down when needed by administration action.
 
Electric Tap Fees
 
   Residential / Commercial up to 200 AMP Single Phase Service $1,000.00
   Residential / Commercial up to 200 AMP Three Phase Service
$2,000.00
   Three Phase or Single Phase Service Over 200 AMP
$3,000.00
   Underground Service
Tap Fee + Cost of Material, + Cost
to Open / Close Ditch
   Underground Transformers Over 50 KVA - Paid by Owner/Developer
Current Cost
   Service Upgrades Over 200 AMP, Customer Pays 100% Material Cost
100%
Line Extensions Over 660'
 
   Single Phase Overhead (ACSR)
$9.20 / foot
   Three Phase Overhead (ACSR)
$15.70 / foot
   Single Phase Underground Cable
$14.00 / foot
   Three Phase Underground Cable
$22.80 / foot
   Transformers Over 50 KVA - Paid by Owner/Developer
Current Cost
Security Lights (Existing City Pole)
 
   New or Existing up to 38 Watt LED
$12.50 / month
   New or Existing up to 100 Watt LED
$16.00 / month
   Change Out or New Light Fixture Installed (included in monthly fee on existing pole)

        38 Watt LED
Included
        100 Watt LED
Included
   New Light Pole Installed

        30 Foot Pole
$450.00
        35 Foot Pole
$550.00
   
Meter Replacement (Due to Tampering)
$75.00
Installation of Banner Over Highway
$100.00 / banner
Distribution Generation
 
   Distribution Generation Application Fee
$100.00
   Special Distribution Meter Fee
$ Current Meter cost
Pole Contacts
 
   Permit Application
Required - Obtain at Permit Office
   1 - 10
$50.00
   11 - 20
$150.00
   21 - 25
$250.00
   26+
Based on Cost Estimate
Permit Fee (Per Pole)
$10.00
Annual Pole Attachment Fee (Per Attachment)
$8.02

SANITATION

 
INSIDE CITY LIMITS
 
   Weekly Curbside Garbage Service or Special Services Cost +
   Monthly Administration Fee - Residential
$25.95
   Weekly Curbside Garbage Service or Special Services Costs +
   Monthly Administration Fee - Commercial
$32.12
   Roll-off Administration Fee
$15.00
   Lawn and Garden Pick-up Fee
$40.00 / cubic yard
OUTSIDE CITY LIMITS
 
   Weekly Curbside Garbage Service or Special Services Cost +
   Monthly Administration Fee - Residential
$26.95
   Weekly Curbside Garbage Service or Special Services Cost +
   Monthly Administration Fee - Commercial
$33.12
   Roll-off Administration Fee
$15.00
   Lawn & Garden Pick-up Fee
$40.00 / cubic yard

TAP FEES - Water & Sewer

 
Water Taps INSIDE City Limits - Water Meter & Service Tap up to 50 Feet; Over 50
Feet an Additional $19.00 / Foot

 
   3/4" Meter
$3,500.00
   1" Meter
$3,800.00
   1 1/2" Meter
$4,400.00
   2" Meter
$5,300.00
   All Water Meters and Taps Larger Than 2" Will be Billed at Cost
   Including Materials, Labor & Equipment
 
Sewer Taps INSIDE City Limits
 
   4" Gravity Sewer Tap Fee (Up to 50 Feet) $35.00 Per Additional Foot.  All GST's Larger Than
   4" Will be Billed at Cost Including All Materials, Labor & Equipment
$3,500.00
   2" Pressure Sewer Tap Fee (Up to 50 Feet) $19.00 Per Additional Foot.  All PST's Larger Than
   2" Will be Billed at Cost Including All Materials, Labor & Equipment
$3,500.00
Water Taps OUTSIDE City Limits - Water Meter & Service Tap Plus $19.00 Per Foot
 
   3/4" Meter
$4,025.00
   1" Meter
$5,370.00
   1 1/2" Meter
$5,060.00
   2" Meter
$6,095.00
   All Water Meters and Taps Larger Than 2" Will be Billed at Cost Including Materials, Labor &
   Equipment Plus 15%
 
Sewer Taps OUTSIDE City Limits
 
   4" Gravity Sewer Tap Fee Plus $35.00 Per Foot.  All GST's Larger Than 4" Will be Billed at
   Cost Including All Materials, Labor & Equipment + 15%
$4,025.00
   2" Pressure Sewer Tap Fee Plus $19.00 Per Foot.  All PST's Larger Than 2" Will be Billed at
   Cost Including All Materials,Labor & Equipment + 15%
$4,025.00

WATER RATES EFFECTIVE 4-1-2021*
*Click HERE for 3-year Schedule

Includes $1.00 for
Council Restricted Fund

INSIDE CITY LIMITS
 
RESIDENTIAL
 
   Meter Size - Rates / Month
      3/4" Meter
$43.40
      1" Meter
$54.52      
      1 1/2" Meter
$65.65
      2" Meter
$96.25
      3" Meter
$321.58
      4" Meter
$405.04
      6" Meter
$599.77
   Volume Rate / 1,000 Gallons
 
      0 - 6,000 Gallons
$2.66 / 1,000 gallons
      6,001 - 20,000 Gallons
$4.66 / 1,000 gallons
      20,001 Gallons and Above
$6.65 / 1,000 gallons
APARTMENTS
 
   Meter Size - Rates / Month (per apartment)
 
      3/4" Meter
$43.40
      1" Meter
$54.52
      1 1/2" Meter
$65.65
      2" Meter
$96.25
      3" Meter
$321.58
      4" Meter
$405.04
      6" Meter
$599.77
   Volume Rate / 1,000 Gallons
 
      0 - 6,000 Gallons
$2.66 / 1,000 gallons
      6,001 - 20,000 Gallons
$4.66 / 1,000 gallons
      20,001 Gallons and Above
$6.65 / 1,000 gallons
COMMERCIAL
 
   Meter Size - Rates / Month
 
      3/4" Meter
$43.40
      1" Meter
$54.52
      1 1/2" Meter
$65.65
      2" Meter
$96.25
      3" Meter
$321.58
      4" Meter
$405.04
      6" Meter
$599.77
   Volume Rate / 1,000 Gallons
 
      0 - 6,000 Gallons
$2.66 / 1,000 gallons
      6,001 - 20,000 Gallons
$4.66 / 1,000 gallons
      20,001 Gallons and Above
$6.65 / 1,000 gallons
OUTSIDE CITY LIMITS
 
RESIDENTIAL
 
   Meter Size - Rates / Month  
      3/4" Meter
$86.80
      1" Meter
$97.92
      1 1/2" Meter
$109.05
      2" Meter
$139.65
      3" Meter
$364.98
      4" Meter
$448.44
      6" Meter
$643.17
   Volume Rate / 1,000 Gallons
 
      0 - 6,000 Gallons
$2.66 / 1,000 gallons
      6,001 - 20,000 Gallons
$4.66 / 1,000 gallons
      20,001 Gallons and Above
$6.65 / 1,000 gallons
COMMERCIAL
 
   Meter Size - Rates / Month
 
      3/4" Meter
$86.80
      1" Meter
$97.92
      1 1/2" Meter
$109.05
      2" Meter
$139.65
      3" Meter
$364.98
      4" Meter
$448.44
      6" Meter
$643.17
   Volume Rate / 1,000 Gallons
 
      0 - 6,000 Gallons
$2.66 / 1,000 gallons
      6,001 - 20,000 Gallons
$4.66 / 1,000 gallons
      20,001 Gallons and Above
$6.65 / 1,000 gallons

WASTEWATER RATES EFFECTIVE 4.1.2021*
*Click HERE for 3-year Schedule

Includes $1.00 for
Council Restricted Fund

Wastewater rates shall be based on the average water consumption for the months  of December, January & February.
 
   
INSIDE CITY LIMITS

RESIDENTIAL
 
   Monthly Minimum Charge
$58.00                     
   Volume Rate / 1,000 Gallons

      0 - 6,000 Gallons
$3.37 / 1,000 gallons
      6,001 - 20,000 Gallons
$4.22 / 1,000 gallons
      20,001 Gallons and Above
$5.27 / 1,000 gallons
APARTMENTS

   Monthly Minimum Charge / Unit
$58.00
   Volume Rate / 1,000 Gallons x # of Units

      0 - 6,000 Gallons
$3.37 / 1,000 gallons
      6,001 - 20,000 Gallons
$4.22 / 1,000 gallons
      20,001 Gallons and Above
$5.27 / 1,000 gallons
COMMERCIAL
   Monthly Minimum Charge
$74.00    
   Volume Rate / 1,000 Gallons

      0 - 6,000 Gallons
$3.37 / 1,000 gallons
      6,001 - 20,000 Gallons
$4.22 / 1,000 gallons
      30,001 Gallons and Above
$5.27 / 1,000 gallons
OUTSIDE CITY LIMITS
 
RESIDENTIAL  
   Monthly Minimum Charge
$116.00
   Volume Rate / 1,000 Gallons
 
   0 - 6,000 Gallons
$3.37 / 1,000 gallons
   6,001 - 20,000 Gallons
$4.22 / 1,000 gallons
   20,001 Gallons and Above
$5.27 / 1,000 gallons
APARTMENTS  
   Monthly Minimum Charge / Unit
$116.00
   Volume Rate / 1,000 Gallons x # of Units
 
   0 - 6,000 Gallons
$3.37 / 1,000 gallons
   6,001 - 20,000 Gallons
$4.22 / 1,000 gallons
   20,001 Gallons and Above
$5.27 / 1,000 gallons
COMMERCIAL  
   Monthly Minimum Charge
$148.00
   Volume Rate / 1,000 Gallons
 
   0 - 6,000 Gallons
$3.37 / 1,000 gallons
   6,001 - 20,000 Gallons
$4.22 / 1,000 gallons
   20,001 Gallons and Above
$5.27 / 1,000 gallons